Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Course description

If a tree is so damaged that its preservation is no longer in the public interest, a tree protection procedure is carried out.

Required documents

Felling application with location sketch and informative pictures

Legal basis

Bavarian Building Code, Tree Protection Ordinance, Nature Conservation Act

Contact Us

Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung
Landeshauptstadt München

Internet address

Phone number

Postal address

Landeshauptstadt München
Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung

Blumenstraße 28b
80331 München

Fax: +49 89 233-25869

Address

Blumenstraße 28b
80331 München

We are closed to the public, the service telephones are manned.

Advice centre:
Monday to Friday (except Wednesday)
9 a.m. to 12 p.m
Tuesday and Thursday
13.30 to 16 o'clock

Telephone counselling:
Monday to Thursday
9 a.m. to 4 p.m
Friday
9 to 12 a.m

Related services

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Water law authorisation - service water wells

If you want to use groundwater for industrial water purposes, you need a permit under water law.

Water law permit - building in flood areas

A water law permit is required for the construction or extension of buildings in flood areas.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.