Water law permit - building in flood areas

A permit or authorisation under water law is required for the erection or extension of structures or measures in floodplains.

Required documents

The application form must be submitted with the documents specified in the form for a water law permit or authorisation.

In addition, the information sheet on the flood-adapted design of the construction project must be submitted if authorisation is required.

Duration and costs

Processing time

The processing time is four weeks to three months, depending on the complexity of the case.

Fees and charges

For a permit: up to 0.6 per cent of the construction sum, depending on the amount of work involved.

For an authorisation: 50 euros to 4,000 euros, depending on the amount of work involved.

Available payment methods

Legal basis

  • §§ Sections 76 to 78 ff of the Federal Water Act (WHG)
  • Articles 46 and 47 of the Bavarian Water Act (BayWG)
  • Floodplain ordinances

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Address

Bayerstraße 28a
80335 München

Monday to Thursday9.30 to 15

Friday9.30 to 13 o'clock

and by telephone arrangement

Related services

Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Water law permit - construction projects in groundwater

Construction projects may result in interference with the groundwater. A permit under water law is required for this.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.