Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Course description

If a tree is so damaged that its preservation is no longer in the public interest, a tree protection procedure is carried out.

Required documents

Felling application with location sketch and informative pictures

Legal basis

Bavarian Building Code, Tree Protection Ordinance, Nature Conservation Act

Landeshauptstadt München

Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung

Internet address

Phone number

Postal address

Landeshauptstadt München
Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung

Blumenstraße 28b
80331 München

Fax: +49 89 233-25869

Address

Blumenstraße 28b
80331 München

We are closed to the public, the service telephones are manned.

Advice centre:
Monday to Friday (except Wednesday)
9 a.m. to 12 p.m
Tuesday and Thursday
13.30 to 16 o'clock

Telephone counselling:
Monday to Thursday
9 a.m. to 4 p.m
Friday
9 to 12 a.m

Related services

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Water law permit - building in flood areas

A permit or authorisation under water law is required for the erection or extension of structures or measures in floodplains.

Water licence - heat pump/ cooling system up to 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.