Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Course description

Drilling into quaternary gravel layers and outside of water protection areas must be reported to the responsible authority. In the city of Munich, this is the Department for Climate and Environmental Protection.

The work can be started after a period of one month. The period begins with the receipt of the complete notification documents. The prerequisite is that the competent authority does not prohibit the drilling within this month

Important note

Important note

Boreholes that extend several metres into the deeper Tertiary strata(clay, silt, sand) require not only a drilling notification but also a permit under water law for boreholes subject to authorisation.

A separate water law permit is required for the operation of the groundwater heat pump or cooling system.

Required documents

The documents should preferably be submitted digitally.

  • Completed notification form
  • General site plan M 1:25,000 with marking of the location
  • Detailed site plan M 1:5,000 or M 1:1,000 with entry of the well locations

Duration and costs

Processing time

Maximum one month.

Legal basis

§ Section 49 of the Water Resources Act (BayWG)Article 30 of the Bavarian Water Act (BayWG)

Contact Us

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht
Landeshauptstadt München

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Contact address

Bayerstraße 28a
80335 München

Availability

  • Available:Barrier-free access
  • Not available:Parking for disabled people

Related services

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Water law authorisation - service water wells

If you want to use groundwater for industrial water purposes, you need a permit under water law.

Water law permit - construction projects in groundwater

If you intervene in the groundwater during a construction project, a permit under water law is required.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Water law permit - building in flood areas

A water law permit is required for the construction or extension of buildings in flood areas.

Drilling and working in groundwater

Drilling operations that reach so deep into the ground that they could come into contact with groundwater must be reported and, in some cases, require a permit