Apply for house number allocation

In the event of structural changes, house numbers are assigned ex officio. Additional house numbers can be issued or existing properties renumbered on request.

Description

In the event of structural changes, house numbers are officially

  • reallocated or reissued (if a house number already existed for the previous building). Assignment from the construction of the shell
  • renumbered if the access route has changed
  • withdrawn if the house number is no longer required.

Additional house numbers can be issued or existing properties can be renumbered on request.

House numbers are only allocated after a site inspection.

Required documents

  • Written application
  • Site plan
  • copy of building permit, if applicable
  • Land register extract

Duration & Costs

Processing time

up to 4 weeks due to necessary site inspection

Fees

  • No fee for reissuing an existing house number and renumbering ex officio
  • new house number and renumbering on request 105.- € - 150 .- €
  • Withdrawal € 25

Payment methods available

Legal basis

Bavarian Streets and Roads Act, street name and house number statutes of the City of Munich

Landeshauptstadt München

Kommunalreferat
GeodatenService
Hausnummern

Internet

Postal address

Landeshauptstadt München
Kommunalreferat
GeodatenService
Hausnummern

Denisstraße 2
80335 München

Address

Denisstraße 2
80335 München

Accessibility

  • Not available:Barrier-free access
  • Not available:Disabled parking

Barrier-free access

Related services

Access to building files (central registry)

If you own a property in the Munich city area, you can view the approved building plans for your house and copy them at coin-operated photocopiers on site.

Advice on neighbour's signature for building application

Owners of neighbouring properties must be involved in the approval process.

Advice on building law

If you are planning a new build, conversion or change of use of a building, the LBK advice centre will answer your questions before you submit your application.

Neighbour signatures for building application

Approval of construction projects where the city is a neighbouring property owner.

Special use of urban public green spaces

Anyone wishing to set up a construction site in a public green space or drive on the green space requires a special permit.

Preservation statutes - authorisation of construction measures

You need a permit for structural alterations, changes of use or the demolition of living space in a conservation area.

Acceptance of temporary structures

Temporary structures must obtain a construction licence before being erected for the first time. As a rule, the installation must be notified at least one week in advance.

Construction measures in public transport areas

Anyone who digs up the ground on public paths, roads or squares, stores or sets up anything, blocks off areas or lays pipes requires a permit.

Building permit

As a rule, you need a building permit from the lower building supervisory authority for construction measures such as new builds, extensions or conversions as well as for changes of use.