Advice on building law

If you are planning a new build, conversion or change of use of a building, the LBK advice centre will answer your questions before you submit your application.

Description

The advice centre will tell you whether your project requires approval, which documents you need for a building application and which building law conditions apply.

Required documents

If available, please bring sketches and a site plan.

Duration & Costs

Processing time

Free building consultation by appointment.

Legal basis

Bavarian Building Code, Building Code

Landeshauptstadt München

Referat für Stadtplanung und Bauordnung
Team 13 Servicezentrum

Internet

Postal address

Landeshauptstadt München
Referat für Stadtplanung und Bauordnung
Team 13 Servicezentrum

Blumenstraße 28b
80331 München

Address

Blumenstraße 19
80331 München

Wir haben für den Publikumsverkehr geschlossen, die Servicetelefone sind besetzt.

Related services

Special use of urban public green spaces

Anyone wishing to set up a construction site in a public green space or drive on the green space requires a special permit.

Apply for house number allocation

In the event of structural changes, house numbers are assigned ex officio. Additional house numbers can be issued or existing properties renumbered on request.

Advice on neighbour's signature for building application

Owners of neighbouring properties must be involved in the approval process.

Neighbour signatures for building application

Approval of construction projects where the city is a neighbouring property owner.

Building consultancy for ongoing construction projects

Information on current planning permission procedures can be obtained directly from the responsible clerk.

Preservation statutes - authorisation of construction measures

You need a permit for structural alterations, changes of use or the demolition of living space in a conservation area.

Acceptance of temporary structures

Temporary structures must obtain a construction licence before being erected for the first time. As a rule, the installation must be notified at least one week in advance.

Construction measures in public transport areas

Anyone who digs up the ground on public paths, roads or squares, stores or sets up anything, blocks off areas or lays pipes requires a permit.

Building permit

As a rule, you need a building permit from the lower building supervisory authority for construction measures such as new builds, extensions or conversions as well as for changes of use.

Access to building files (central registry)

If you own a property in the Munich city area, you can view the approved building plans for your house and copy them at coin-operated photocopiers on site.