Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Description of the course

After tree felling or other changes to the woodland in landscape conservation areas and protected landscape features, replacement planting may be required as compensation.

Once the replacement planting has been completed, you must notify the Lower Nature Conservation Authority of the City of Munich.

To do this, fill in the form below. Then send it by e-mail or post to the Lower Nature Conservation Authority in the Department for Climate and Environmental Protection of the City of Munich.

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Untere Naturschutzbehörde, Fachgutachten

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Untere Naturschutzbehörde, Fachgutachten

Bayerstraße 28a
80335 München

Address

Blumenstraße 28b
80331 München

Related services

Water law permit - building in flood areas

A permit or authorisation under water law is required for the erection or extension of structures or measures in floodplains.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Water law permit - construction projects in groundwater

Construction projects may result in interference with the groundwater. A permit under water law is required for this.

Water licence - heat pump/ cooling system up to 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.